Ex post evaluation of the Wei Wei Integrated Development Project   

  AddThis Social Bookmark Button


Ex post evaluation

Click to see the certificate!

The Wei Wei Integrated Development Project: 

A Success Story In Desertification Control

By Alex Mugova and Jealinda Mavunga
The authors, Socio-economics and Natural Resources Experts,
respectively were hired by UNEP to evaluate the success of the Project.

INTRODUCTION 

The Wei Wei Integrated Development Project (WWIDP) was started in 1987 following the signing of a development co-operation agreement between the Ministry of Foreign Affairs of the Government of Kenya (GoK) and the Italian Cooperation to Development. According to the project design, the planned key outputs of the project were as follows:

bullet

Construction of intake weir on the Wei Wei river with a maximum intake flow of 1.2 cubic meters per second; · 

bullet

Laying of an underground steel and PVC pipeline network that would distribute water through gravity fed sprinkler irrigation units on each plot; 

bullet

Land reclamation and improvement over 700 ha; 

bullet

Setting up of a pilot farm (50 ha) to provide logistical, equipment and other inputs support to the whole scheme; 

bullet

Development and allocation of 540 individual plots of 1 ha each;

bullet

Construction of a fully equipped service centre to provide workshop, stores and office facilities.

The complete assessment is found at the following pages:

 

Get the full report in PDF format

Additional information on the Award may be obtained from 
Dr. Elizabeth Migongo-Bake, Success Stories Coordinator, DEPI, UNEP 
www.unep.org 

 

Hit Counter